Moreover, all our generation processes are in compliance with ISO9002 requirements. we have received the have faith in of purchasers around the world. The higher precise CNC tools, such as Sluggish-feeding wire-lower machine, jig grinding device and electric discharge equipment, ensures the top quality precision of mould processing, with the substantial efficient and environmental protection acid rolling line currently being the biggest raw materials converting equipment in the field in china The wildly use of automated milling machine, large-velocity automatic feeding punch, substantial pace computerized rolling and assembling machine assures the large high quality and effectiveness of elements and chain making.
EPTT Formal Qy50ka fifty Ton EPTT Crane for Sale
EPTT QY50KA EPTT crane’s framework is compact, the business operating performance is the greatest. EPTT functionality and driving efficiency of a thorough improve, leading competitors. Twin-pump confluence EPTT, running performance of a complete guide.
one. EPTTing lifting and driving performances
5 EPTT U-variety booms. The growth length is 11.4m-forty three.5m with robust lifting performance, leading 5%-ten% in advance of goods with the same tonnages in the very same market.
High-EPTT motor with great dynamic efficiency, powerful gradeability and excellent trafficability. The maXiHu (West Lake) Dis.mum gradeability and maXiHu (West Lake) Dis.mum journey pace respectively are 42% and 85km/h.
2. Dependability of heat dissipation, EPTT method and many others. has been improved with safer operation and driving
Water-proof connector clip is outfitted with rubber sheath inside with superb drinking water impervious and amount of protection reaches to IP65.
The air-conditioning condenser is independently put in, the warmth-sinking functionality is sharply improved and the surroundings temperature reached to much more than 45 ordmC.
three. Experienced and reputable double-pump confluence method, mainXiHu (West Lake) Dis.Hu (West Lake) Dis. the rewards of productive procedure
The double-pump confluence technique is adopted in boosting and slipping of winch, extending and retracting of lazy growth and luffing, foremost in advance of luffing and extending and retracting functions.
four. Air-help change EPTTs and 45% of shifting pressure is decreased
The increase program will perform only by stepping on the clutch that properly avoids EPTT harming EPTTs when shifting. When compared with the very same sector, 100mm length of shift EPTTs and forty five% of shifting drive are respectively decreased.
[Product Parameter]
Description | Device | Parameter price | |
All round size | mm | 13930 | |
All round width | mm | 2780 | |
Overall Peak | mm | 3630 | |
Axle foundation | 1st ,2nd axle | mm | 1470 |
2nd ,3rd axle | 4300 | ||
3rd ,4th axle | 1350 | ||
Wheel Foundation | mm | 2304 2075 | |
Entrance overhang/rear overhang | mm | 2389/2064or 2376/2064 | |
Entrance extension/rear extension | mm | 2131/226 or 2144/226 | |
Overall car mass in vacation configuration | kg | 42200 | |
Axle load | Entrance axle | kg | 16200 |
Rear axle | 26000 | ||
Motor Product | WD615.338 | ||
Motor rated EPTT | kw/(r/min) | 276/2200 | |
Engine rated torque | N.m/(r/min) | 1500/1300-1600 | |
Max. travel velocity | km/h | 85 | |
Min. regular vacation pace | km/h | 2~three | |
Min. turning diameter | m | 24 | |
Min. ground clearance | mm | 327 | |
Max. grade capability | % | forty two | |
Strategy angle | deg | 19 | |
Departure angle | deg | 15 | |
Braking length (at thirty km/h, full load ) | m | le10 | |
Oil consumption for each 100km | L | forty | |
Exterior sound stage for the duration of acceleration touring | dB (A) | le88 | |
Sound degree at seated position | dB (A) | le90 |
[Merchandise Photograph]
[Organization Info]
[FAQ]
1: What sort phrases of payment can be accepted?
A: For phrases of payment, L/C, T/T, D/A, D/P, Western EPT (can be) could acknowledged.
2: What certificates are obtainable in EPTTry?
A: For the certificate, we have CE, ISO, Gost, EPTA(United states of america)CCC.
three: What about the supply time?
A: 7-30 daEPTTafter obtaining the deposit.
4: What about the guarantee time?
A: twelve months after cargo or 2000 operating hrs, whichever occuts first.
five. What about the Bare minimum OrEPTTEPTTtity?
A: The MOQ is 1 pcs.