More importantly, we make specific elements according to supplied drawings/samples and warmly welcome OEM inquiries. PersonnelOur income people are nicely skilled to accommodate your requests and communicate English for your ease. Our product variety also handles locking assemblies (clamping aspects/locking unit), taper bushes, QD bushes, bolt-on hubs, torque limiters, shaft collars, motor bases and motor slides, chain detachers, chain guides, universal joint, rod finishes and yokes. 35L 55L 75L EPT Compound Banbury Mixer EPT/Plastic Banbury Mixer
one MiXiHu (West Lake) Dis.ng Chamber
It is composed of a quotw quot shape body and two facet boards produced of higher good quality metal plates by implies of extrusion forming and welding, which are jacked to consider the flow of cooling h2o or steam. It is plated with challenging chrome on its inside walls.
2 Typical Note EPT
Timing EPT pump to the sealing program on a normal EPT of EPT oil, lubrication sealing effect.
3 Thermal Resistance (or thermal couple)
There is a plug-in thermal resistance or thermal few in center EPT of the bottom of the chamber to be linked to EPT technique to inspect and manage the miXiHu (West Lake) Dis.ng temperature.
four. Rotors
It is designed to the hollow blades of banbury kind. The hollows are linked with aXiHu (West Lake) Dis.al hole of rotor shaft utilized as cooling or heating passage. The top edges and the aspect faces of blades are floor welded with difficult alloy and ground, then plated with tough chrome and poEPTd.
five Cooling/heating Method
A common piping program is adopted for either cooling or heating materials in miXiHu (West Lake) Dis.ng procedure. By way of the method cooling drinking water or steam is fed in three waEPTto the cavities of the rotors blades, – the jackets of the miXiHu (West Lake) Dis.ng chamber and the prime ram.
six Tilting Mechanism
It is made up of a rotor with brake, cycloidal EPT EPT, TP variety worm and worm EPT, etc. It is capable to actuate the miXiHu (West Lake) Dis.ng chamber tilting by one hundred forty deg around the front rotors.
7 Dust End Device
At the joint between the prime of miXiHu (West Lake) Dis.ng chamber and the cantiEPTed arm of the EPT body, the dust sealing assembled with curved slotted partings are used for obXiHu (West Lake) Dis.Hu (West Lake) Dis. an superb and trustworthy sealing purpose. The conclude encounter of the rotor is sealed by end make contact with sealing with non oil-lubrication and it seals properly and is dress in-resistance and tough.
eight Major Driving System
The component is created up with primary motor, EPT, connecting EPTs. It realizes odd-speed rotation of rotors with running experience a single other.
9 Pneumatic manage technique
Pneumatic manage system is managed by PLC purchase. A bi-directional air cylinEPTmakes the ram up or down. In circumstance of the in excess of load takes place when miXiHu (West Lake) Dis.ng chamber, the prime ram can be elevated immediately or manually if needed, so as to defend motor from overloading.
10 Electrical Manage Program
EPTorted PLC system and electrical control elements which are all EPTed goods or EPTed EPT goods are adopted in the electric control method as to raise handle dependability.
eleven Dust Sealing Device
MiXiHu (West Lake) Dis.ng chamber catchy interface rack cantiEPT the oil dust seals and timing impact oiling dust, EPT construction, the use of copper components, good sealing overall performance, no leakage of the glue, powEPTleakage, do not pollute the surroundings, but also has straightforward routine maintenance and EPT service existence.
12 EPT Parameters:
Merchandise | Device | X(S)N-3×32 | X(S)N-10×32 | X(S)N-20×32 | X(S)N-25×32 | X(S)N-35×30 | X(S)N-55×30 | X(S)N-75×30 | X(S)N-110×30 | X(S)N-150×30 | X(S)N-200×30 |
Total Volume of MiXiHu (West Lake) Dis.ng Chamber | (L) | eight | twenty five | forty five | 55 | 75 | a hundred twenty five | a hundred and seventy | 250 | 325 | 440 |
Working Quantity of MiXiHu (West Lake) Dis.ng Chamber | (L) | 3 | ten | twenty | 25 | 35 | fifty five | 75 | 110 | one hundred fifty | two hundred |
Driving EPT EPT | (KW) | five.five | 22 | 37 | 37 | 55 | 75 | 110 | 185 | 220 | 280 |
Titling EPT EPT | (KW) | .fifty five | 1.1 | 1.five | 1.5 | 2.2 | two.two | 4 | 5.5 | 11 | 11 |
Rotational Velocity of The Rotor (front/rear) | (r/min) | 30/24.five | 32/twenty five | 32/27 | 32/27 | thirty/24.5 | thirty/24.5 | thirty/24.five | thirty/24.five | thirty/24.5 | 30/24.five |
Force of Compressed Air | (m sup3/min) | ge0.three | ge0.five | ge0.seven | ge0.7 | ge0.nine | ge1. | ge1. | ge1.five | ge2. | ge4. |
Strain of Cooling Drinking water (miXiHu (West Lake) Dis.ng rubber) | (MPa) | .2~.four | .2~.four | .2~.4 | .two~.4 | .3~.4 | .three~.4 | .three~.four | .three~.four | .three~.four | .three~.4 |
Stress of Heating Steam (plastic miXiHu (West Lake) Dis.ng) | (MPa) | .five~.8 | .five~.eight | .five~.8 | .five~.eight | .five~.eight | .five~.8 | .five~.8 | .5~.8 | .five~.eight | .5~.eight |
Dimensions (L x W x H) |
(mm) | 2000×1000 x2220 |
2640×1650 x2350 |
2675×1650 x2560 |
2675×1650 x2560 |
3200×1900 x2950 |
3230×1927 x2958 |
3325×2615 x3150 |
4075×2712 x3580 |
4250×2750 x4106 |
4250×3400 x4215 |
FQA-Troubles of consumer concern:
About EPT overall performance high quality
1. Q: How to guarantee the quality of outsourcing areas?
A: First selection much more than four suppler by tender, There are rigorous method and procedure for inspecting outsourcing areas. And there are outsourcing inspectors, soon after inspection, qualified items, labeling and storage. Not competent, return.
two. Q: Which model of electric powered component?
A: Use globe well-known manufacturers, EPT, Omron, Toshiba, Schneider, ABB Client can specify the model.
3. Q: Which PLC:
A: EPT, Omron, Mitsubishi
four. Q: How to control the top quality?
A: There are inspectors for inspecting tools good quality and performance, soon after a ssembly, EPT operate repeatedly for at lEPT twelve hours at a single time, Overall working time must be not considerably less than forty eight several hours.
About set up
1. Q: When the XiHu (West Lake) Dis.Hu (West Lake) Dis. engineer arrive at customer’s manufacturing unit?
A: If require set up on website, engineer will get there at manufacturing unit inside of one particular 7 days following EPT arrived at factory.
About right after-income services
1. Q: What is the warranty time?
A: 5 years right after EPT arrived at factory
two. Q: How to remedy the problem?
A: Inside of fifty percent an hour following receiving customer’ issue, inform the solution way, there are a few waEPTfor different problems. 1, Which can be solved by cellphone or E mail, it will be solved in two hrs. two. Which can be solved by Distant Control, it will be solved within four several hours(EPT is equipped by Remote Network Control Difficulty). three. Which want remedy it on internet site, engineer get there at manufacturing facility inside of one particular 7 days(in the two years guarantee day, engineer has the visa any time of the region in which the EPT.