in Uberlandia Brazil sales price shop near me near me shop factory supplier 950 Roofing Tile Forming Machine Manufacture manufacturer best Cost Custom Cheap wholesaler

  in Uberlandia Brazil  sales   price   shop   near me   near me shop   factory   supplier 950 Roofing Tile Forming Machine Manufacture manufacturer   best   Cost   Custom   Cheap   wholesaler

We are hunting forward to developing effective enterprise interactions with new clientele close to the entire world in the long term. High quality and credit rating are the bases that make a company alive. The team is centered on creating all variety of normal roller chains and sprockets, gears & gearboxes, this sort of as conveyor chain & sprockets , stainless metal chain, agricultural chain and has not just sold its goods all over china, but also offered much more than 65% products to oversees, which includes Europe, The united states, South-east Asia, and it also has set up storage logistics in areas like Europe. 950 roofing Tile Forming EPT Manufacture

1 period of time Great appearence period of time
2 period Minimal sounds period
three time period High performance period of time
4 period Excellent good quality interval
5 period Esay manage time period
Guy-made uncoiler-Roll forming EPT-compture handle system-EPT handle system-form cutter

XiHu (West Lake) Dis.hu (West Lake) Dis. unit
Undertake XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to handle the width and place of the steel sheet period of time The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the proper situation and handed to the roll forming system period Can alter the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT situation period It aposs mounted framework to make confident can not go effortlessly time period
Roll Forming Program colon
Roll forming method consist of EPT frame comma EPT technique comma EPT motor and roll forming program period of time
A interval EPT body adopts welding construction with shot blasting and painting treatment
B period of time All rollers substance adopt high top quality No interval 45 metal comma with hard chrome coated on area comma all remedy by entire CNC EPTs comma to make confident the rollers with good rigidity and precision comma and form perfect roofing sheet as for each design period
C time period All rolling shafts are made by high high quality No time period 45 metal with quench and mood treatment method comma so the shafts with very good rigidity which could use for EPT tern without deformation period
D period of time Rolling shafting supporting construction sort is metal wall and welded with the basement together to have rigidity time period
E interval Cycloidal pin EPT pace EPT motor EPTn comma the again solEPT roller EPTn by EPT comma component of upper sollower rollers EPTn by EPT
F time period Alter the screw bar manually to modify the length in between higher sollower rollers for variation thickness of sheet interval
lparAttention colon All rolling program has modified in our firm as a excellent situation comma we don apost recommend to change the rollers at random comma if required comma ought to change by a experienced technician or soon after teach by our engineer time period Or else will trigger the EPT can not type a very good profile

Previous station ought to be like this there is no room between

Reducing gadget

A period of time Adopts put up slicing comma the chopping blade content is Cr12 with quenched treatment comma soon after reducing comma there is no material squandered interval
B period of time Adopts welded frame for excellent rigidity period
C interval The slicing motion is droved by the EPT from EPT station which ensures the procession of the chopping and low noisy comma EPT life time period

It is managed by EPT wheel oil pump interval Following filling the EPT oil into the EPT oil tank comma the pumps EPT the cutter EPT to start the reducing job interval
The technique incEPTs a established of EPT tank comma a set of EPT oil pump comma two EPT pipes period of time And two sets of electromagnetism valves period of time
EPT of the oil pump colon 4kw
EPT oil colon 40 num
PLC control program

It adopts EPT laptop to manage period of time The goal piece aposs duration is adjustable and digit of it can be altered time period Computed method has two modes colon EPT and guide 1 interval The system is easy to operate and use period of time
Processing precision colon Inside 1 period00mm
It consists of touch EPT comma programmer comma transformer for the digital EPTs and kits of each and every component period of time
PLC is EPTiwan Panasonic
Transducer model is EPTiwan taida
The vendor ought to offer EPT and EPT language EPT
Counter
One particular counter gauges size comma pulses comma and decides duration period of time

Suitable to process Steel plate
Rollers 13rows
Dimensions eleven ast1 period2 ast0 period9m
EPT 3kw lpar2sets rpar cycloidal needle wheel type
Diameter of the roller cent52mm
Body of the EPT Welded 300H steel facet board is produced of 16mm steel construction
Reducing to length employing traveling noticed slicing
Decoiler colon Growth sort max commaloading1-2T
Voltage 380V 50Hz

  in Uberlandia Brazil  sales   price   shop   near me   near me shop   factory   supplier 950 Roofing Tile Forming Machine Manufacture manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Uberlandia Brazil  sales   price   shop   near me   near me shop   factory   supplier 950 Roofing Tile Forming Machine Manufacture manufacturer   best   Cost   Custom   Cheap   wholesaler