We examine every single piece of bearing by ourselves before shipping. In 2000, EPG took the lead in gaining ISO14001 atmosphere management certification and thereafter passed the inspection of clean manufacturing and recycling economic climate, profitable the title of “Zhejiang Environmentally friendly Company”. Due to our sincerity in supplying best provider to our clients, knowing of your demands and overriding feeling of accountability toward filling ordering demands,
EPTT formal maker RT25 35ton EPTT crane
RT35 is outfitted with the two-axle loading chassis, which has two kinds of EPTT modes, four varieties of steering modes and backward-EPTT driving functions. It also has 4 EPTTs of dodecagon main booms, H-sort outrigger, fixed equilibrium counterweight, as properly as 3 working modes, incXiHu (West Lake) Dis.Hu (West Lake) Dis.: hoisting with the help of outriggers, hoisting with the assistance of tire and hoisting when driving. It is extensively utilized in oil subject, EPTT, street and bridge development, warehousing base and other building sites.
EPTT EPTT of EPTTing, Broad Assortment of Function
It has 32m primary booms, 15m auXiHu (West Lake) Dis.liary booms, with the EPTTest booms, greatest extensive hoisting efficiency in the product of the identical tonner.
Maneuvering and FleXiHu (West Lake) Dis.ble, Swift and Effective
The max pace reaches 38km/h and the max gradeability is 55% and the min. turning radius is 5.7m. All these 3 elements make it fleXiHu (West Lake) Dis.ble.
Protected and Trustworthy, No Fret to Deal with
The merchandise is equipped with lifting safety control system in case of overload, over-retracting and over-stretching as effectively as unique EPTT in this field like rear axle-wheel automatic return-manage program and security-driving computerized safety program. All these elevate its security overall performance mainly.
The product is geared up with best features in this area, specialist matching upgrading and systematic evaluation test. And it has passed examination like driving 11,000km and 10,000 times hanging. Both make sure its dependability.
EPTTnomic and EPTT Protection, with Value EPTT
The item is equipped with optical matching EPTT EPTT system and torque converter with lockout purpose, which lessen the oil intake in excess of 20% at large pace.
The 1-way stabilized recent manage of pXiHu (West Lake) Dis.Hu (West Lake) Dis.lel EPTT pressure program minimizes the reduction of stream the gravity fall luffing technique demands no additional EPTT and help save the oil intake.
Comfortable to Manage, Handy to Operate
The solution is geared up with complete hydro-steering manage method and computerized-guide EPTT box, which make it easy to deal with. And the compounded suspension of leaf EPTT and EPTT oil tank, and the self-recognition phased control of rotary cushion EPTT make the procedure stability and comfy
The solution is geared up with XiHu (West Lake) Dis.Hu (West Lake) Dis.nized climb ladder, upkeep access and manage structure. And it is geared up with expert gentleman-EPTT engineering EPTTlation evaluation exquisite man-EPTT interface and stand-by itself fault diagnose function. It is relaxed to take care of and convenient to run.
Primary specialized data in journey configuration
Category | Product | Parameter | Allowance | ||
Dimension |
Total duration | mm | 11952 | plusmn1% | |
Total width | mm | 2980 | -1%~ | ||
Total top | mm | 3450 | -1%~ | ||
Wheel foundation | mm | 3700 | plusmn1% | ||
(/) Observe (entrance/rear) | mm | 2440 | plusmn1% | ||
/Entrance/rear overhang | mm | 1900/2151 | plusmn1% | ||
/Entrance/rear extension | mm | 4201/ | plusmn1% | ||
Weight |
Kerb mass | kg | 30300 | plusmn3% | |
Axle load | 1st Axle | kg | 15100 | plusmn3% | |
2nd Axle | kg | 15200 | plusmn3% | ||
Travel |
Max. vacation speed | km/h | 38 | ge | |
Min. turning radius | m | 5.seven(),nine.six() 5.7 (4 wheels), nine.six (two wheels) |
plusmn3% | ||
Min. floor clearance | mm | four hundred | plusmn1% | ||
Strategy angle | deg | 23 | plusmn1 deg | ||
Departure angle | deg | twenty | plusmn1 deg | ||
(24km/h) Braking length (at 24 km/h) |
m | nine | le | ||
Max. grade-capability | % | 55 | ge | ||
EPTT |
Motor product | QSB6.7-C190 | / | ||
Rated engine EPTT | kW | 142 | / | ||
Engine rated rotation speed | r/min | 2200 | / | ||
Engine emission stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd | off-road EU Stage IIIA | / | |||
Driving type | four times2, 4 times4 | / | |||
Tire specs | twenty.5R25 | / | |||
Quantity of tires | four | / |
Major specialized info for lifting operation
Group | Product | Parameter | Allowance | |||
Main overall performance |
Max. rated lifting capacity | t | 35 | plusmn5% | ||
Min. rated operating radius | m | three | plusmn1% | |||
() EPTT radius at turntable tail (at counterweight) |
mm | 3885 | plusmn1% | |||
Max. load second | Base increase | kN middotm | 1445.5 | plusmn5% | ||
Fully-extended increase | kN middotm | 835 | plusmn5% | |||
Outrigger span | EPTTitudinal | m | 6.nine | plusmn1% | ||
(/) Lateral(fully/half extended) |
m | six.nine/5.eight | plusmn1% | |||
EPTT peak | Foundation boom | m | 9.seven | plusmn1% | ||
Fully-prolonged boom | m | 31.7 | plusmn1% | |||
Fully-extended boom Jib | m | forty five.one | plusmn1% | |||
EPTT length | Foundation growth | m | ten.one | plusmn1% | ||
Fully-extended boom | m | 32 | plusmn1% | |||
Entirely-extended boom Jib | m | forty seven | plusmn1% | |||
Jib offset angle | deg | , fifteen, 30 | plusmn1 deg | |||
Functioning velocity |
Time for increase increasing | s | sixty five | le | ||
Time for boom extending fully | s | eighty five | le | |||
Max. slewing velocity | r/min | two.5 | ge | |||
Outrigger extending/ retracting time | Outrigger beam | EPTTltaneously extending | s | twenty five | le | |
EPTTltaneously retracting | s | 15 | le | |||
Outrigger jack | EPTTltaneously extending | s | thirty | le | ||
EPTTltaneously retracting | s | fifteen | le | |||
() EPTTing speed (at 4th layer, no load) |
Primary winch | m/min | one hundred twenty | ge | ||
AuXiHu (West Lake) Dis.liary winch | m/min | one hundred twenty | ge |
FAQ
one: What variety conditions of payment can be acknowledged?
A: For terms of payment, L/C, T/T, D/A, D/P, Western EPT (can be) could acknowledged
two: What certificates are offered in EPTTry?
A: For the certificate, we have CE, ISO, Gost, EPTA(Usa)CCC,
three: What about the shipping and delivery time?
A: thirty daEPTTafter acquiring the deposit.
four: What about the guarantee time?
A: twelve months soon after shipment or 2000 working several hours, whichever occuts initial.
5. What about the Minimum OrEPTTEPTTtity?
A: The MOQ is one pcs